Skip to content
Blue UASNDAA §848

Heven AeroTech

Raider

Defense/tactical heavy payload missions

Compliance & capability

Compliance

Blue UAS
Cleared
NDAA §848
Cleared
Green UAS
Unconfirmed
Remote ID
Unconfirmed
CMMC Level 2
Unconfirmed

Capability

LiDAR
Unconfirmed
Multispectral
Unconfirmed
Hyperspectral
Unconfirmed
Gas detection
Unconfirmed
SAR / radar
Unconfirmed
Payload swappable
Yes

Authorized dealers

Specifications

Class
Heavy-payload tactical hybrid VTOL (twin-fuselage quad-plane)
Primary Use / Category
Defense/tactical heavy payload missions
Wingspan / Length / Diameter
25 ft (7.5 m) wingspan, standard config; a compact 18 ft (5.5 m) variant is also referenced
Max Take-off Weight (lbs)
262 lbs (119 kg)
Endurance
12+ hrs
Range
>620 mi (>1,000 km), one-way
Payload Swappable
Yes — <5 min tool-free payload & H2 tank swap
Max Payload
50 lbs (23 kg)
Propulsion Type
Hybrid hydrogen-fuel-cell/electric - four electric VTOL lift motors plus one pusher motor drawing on hydrogen fuel-cell power
Fuel Type
Hydrogen
Velocity Never Exceed (VNE)
64 mph (28 m/s)
Operating Temp Range
Down to -20C
Notes
DEFENSE-LEANING product; retained per master listing. Specs sparse — verify; consider defense-directory tracking if strike-oriented. VALIDATED Aug 2026: MTOW (262 lbs/119 kg) and payload (50 lbs/23 kg) cross-confirmed by both the current site and EDR Magazine (Feb 2025, IDEX). Design is more accurately a twin-fuselage hybrid VTOL/quad-plane (four VTOL lift motors + one hydrogen-fuel-cell-powered pusher motor) rather than a pure multirotor, per the current site ('Twin-fuselage VTOL design') and EDR Magazine - Class field corrected accordingly. RANGE IS UNRESOLVED: the prior entry (>620 mi/1,000 km) could not be corroborated by any source found; EDR Magazine (2025, prototype stage) cited a materially lower 350 km (217 mi) max range; the current official site publishes only a 12+ mile communication range (a different metric, not flight range). Do not rely on the Range figure without direct manufacturer confirmation. EDR Magazine (Feb 2025) projected customer deliveries beginning in 2026.
Accuracy
Partially verified - MTOW and payload confirmed across two independent sources; Range figures conflict between sources and are UNRESOLVED (flag for manufacturer follow-up); speed/endurance/temp-range corroborated with caveats - see Notes.
RTK / PPK
Not specified - no credible public source confirms RTK/PPK on any Heven AeroTech platform. Heven's literature emphasizes GPS-denied operation and a quantum-secure PNT roadmap (IonQ partnership, announced Nov 2025) rather than RTK/PPK survey-grade positioning; these are tactical/ISR/logistics platforms, not mapping/surveying UAS. Do not assume RTK/PPK is included without direct manufacturer confirmation.

Last updated August 16, 2026Source: company sites and public federal registriesHow we verify

Spotted a detail that looks wrong? Suggest an edit.